Power availability in Douglasville: DCPI verdict AVOID, composite score 22.7 of 100, as of 2026-10-13. Source: DC Hub.
Data Center Market Deep-Dive · 350 words · generated 2026-10-13 from live DC Hub data · DCPI live as of 2026-10-13
Douglasville has 270 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-10-13. By listed capacity the largest operators are Google (150 MW) and CyrusOne (120 MW).
| Status | MW |
|---|---|
| Operational | 270 |
| Total listed | 270 |
Source: DC Hub (dchub.cloud), facility records as of 2026-10-13. Verified sites that report MW only; blank means no MW reported. The Total MW above also counts unverified directory listings.
DC Hub does not hold a lease-rate figure for this market yet.
Douglasville hosts tracked facilities representing 270 MW of deployed capacity, but faces acute power availability constraints that limit near-term growth. Flexential operates the largest footprint with facilities in the region, followed by single-site operators including ALIGNED DATA CENTERS ATL01, CoreWeave, and CyrusOne. The absence of recent M&A activity in Douglasville contrasts sharply with acquisition momentum in adjacent Georgia markets, suggesting limited seller motivation or buyer confidence.
The DCPI verdict of AVOID carries explicit weight for acquisition-focused investors. A combined excess-power and constraint score pointing toward avoidance indicates that capital deployed into Douglasville assets faces structural headwinds: power procurement costs will remain elevated, interconnection timelines extended, and utility coordination friction persistent. Strategic buyers eyeing consolidation should expect that Flexential's three-site cluster would command acquisition multiples reflecting scarcity value, not growth optionality—a misalignment of price and forward returns.
Operator dynamics remain fragmented. No single player dominates beyond Flexential's facility presence; the remaining facilities are distributed across four operators, each holding single sites. This fragmentation suggests low acquisition appetite has persisted, leaving smaller operators entrenched. The lack of tracked M&A does not indicate stability—it suggests that sellers and buyers both recognize the market's power constraints as a valuation depressant. CoreWeave's presence signals continued interest in GPU-intensive workloads despite grid limitations, though CoreWeave's single facility represents a minimal footprint compared to its national deployment strategy. CyrusOne and ALIGNED DATA CENTERS ATL01 maintain operational presence but show no expansion signals.
Forward momentum in Douglasville will depend entirely on utility-side relief, which remains undeclared. Investors should monitor whether Georgia Power commits incremental circuit capacity to the Douglasville corridor; absent that, the market will continue functioning as a constrained secondary node within metro Atlanta's broader data center ecosystem rather than as an independent growth engine.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Google Douglas County | Operational | 150 | |
| CyrusOne Atlanta | CyrusOne | Operational | 120 |
| ALIGNED DATA CENTERS ATL01 | |||
| CoreWeave Douglasville GA (Flexential) | CoreWeave | Operational | |
| Flexential Atlanta - Douglasville 1 | Flexential | Operational | |
| Flexential Atlanta - Douglasville 2 | Flexential | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Georgia.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Douglasville: 270 MW — live, cited, and queryable by API or MCP.
Pro $99 · or $10 one-time = 1,000 API credits (1 per call, 5 for heavy tools). Pro-only tools not included.
JSON: /api/v1/markets/douglasville/deep-dive · DCPI: /dcpi · Operators: /operators · Updated nightly