Market Brief · CAUTIONDCPI score pending · Live as of 88% live coverage · 7/8 sections
| Operator | Facility | Power | Status | ETA |
|---|---|---|---|---|
| Yondr Group | Yondr Lancaster (Dallas Campus) | 550 MW | Planned | Not tracked |
| DataBank | DataBank Red Oak Mega Campus | 500 MW | Under Construction | Not tracked |
| Anthropic / Fluidstack | Anthropic Texas AI Campus | 300 MW | Planned | Not tracked |
| Compass Datacenters | Compass Red Oak Campus (Dallas) | 250 MW | Under Construction | Not tracked |
| Crow Holdings | Crow Holdings / CleanArc - Stemmons Corridor | 245 MW | Planned | Not tracked |
| PowerHouse Data Centers | PowerHouse Irving (Las Colinas) | 201 MW | Under Construction | Not tracked |
| CoreWeave | CoreWeave Helios TX (Core Scientific) | 200 MW | Under Construction | Not tracked |
| Compass | Compass Allen TX-1 | 96 MW | Under Construction | Not tracked |
| Edged | Edged Texas 1 | 80 MW | Under Construction | Not tracked |
| QTS | QTS DFW-3 | 48 MW | Under Construction | Not tracked |
| Arcadian Infracom | Arcadian Infracom Dallas PoP | Not tracked | Planned | Not tracked |
| Operator | Facilities | Total MW |
|---|---|---|
| DataBank | 17 | 590 MW |
| Digital Realty | 16 | 234 MW |
| Equinix | 15 | 518 MW |
| Flexential | 11 | 148 MW |
| Aligned | 8 | 1,242 MW |
| Date | Buyer | Seller | Value | MW |
|---|---|---|---|---|
| 2026-10-19 | Stack | Not tracked | $540 | Not tracked |
| 2026-09-30 | Amazon | Not tracked | $430 | Not tracked |
| 2026-08-19 | QTS | Not tracked | Not tracked | 48 MW |
| 2026-06-05 | Compass | Not tracked | $15 | Not tracked |
| Not tracked | KIDZ AI | Not tracked | $45 | Not tracked |
Dallas hosts 392 tracked data center facilities totaling 7,067 MW across operational, under-construction, and planned assets, positioning it as a major regional hub. DataBank leads with 17 facilities, followed by Digital Realty (16), Equinix (15), and Flexential (11), reflecting competitive operator density. The market has attracted multiple large-scale development commitments, including Flexential's 110-acre acquisition outside Dallas in Talty targeting a 108 MW campus and a separate 245 MW project at Dallas Market Center announced by Crow and CleanArc.
The DCPI verdict of CAUTION—driven by excess-power scoring of 56/100 paired with constraint scoring of 60/100—signals meaningful but not prohibitive operational headwinds for capacity-focused buyers. The excess-power score indicates tightening margins between available supply and demand, while the constraint score reflects emerging utility and interconnection bottlenecks that are not yet acute enough to warrant an AVOID rating. Investors should conduct granular power audits by submarket and utility district before committing capital; wholesale capacity additions face moderate delays rather than blocking conditions. Unlike markets with AVOID verdicts where expansion planning becomes speculative, Dallas permits deliberate growth for operators with existing grid relationships or committed utility upgrades.
Recent announced investment shows fragmentation across investment vehicles rather than consolidated mega-deal momentum. KIDZ AI announced a $44.6 M investment commitment, while Northampton Capital Partners and Provident Data Centers formed a joint venture of undisclosed size. A separate $1.4 B investment commitment entered tracking without named parties, suggesting either confidential sponsor participation or early-stage syndication structures. This dispersal contrasts with market consolidation patterns seen in peer regions, where larger single-sponsor acquisitions dominate. Operator dynamics remain stable: the top four control approximately 59 of 392 tracked facilities, indicating moderate concentration with room for mid-tier and emerging operators to secure sites before major platform consolidation occurs.
Flexential's land acquisition and active campus planning indicate confidence in Dallas's medium-term power and real-estate fundamentals, though municipal preparedness concerns flagged in recent North Texas surveys suggest infrastructure coordination risks warrant monitoring through 2025 planning cycles.