Live · 1.1h fresh
Market Brief · AVOIDDCPI score pending · Live as of 75% live coverage · 6/8 sections
| Operator | Facility | Power | Status | ETA |
|---|---|---|---|---|
| Google Council Bluffs Building 5 | 60 MW | Under Construction | Not tracked |
| Operator | Facilities | Total MW |
|---|---|---|
| 6 | 910 MW | |
| CyrusOne | 5 | 0 MW |
| Edged | 1 | 200 MW |
| CYRUSONE LLC | 1 | 0 MW |
| GABLE CORP | 1 | 0 MW |
Council Bluffs hosts 20 tracked facilities representing 1,110 MW across operational, under-construction, and planned assets. Google dominates the operator landscape with 6 facilities, followed by CyrusOne with 5 properties, while GABLE CORP and STREAMLINE UTILITY HOLDINGS each operate single sites. The market's infrastructure reflects the region's established position as a secondary Midwest data center hub, though scale remains modest compared to tier-one markets.
The DCPI verdict of AVOID stems from a structural mismatch between power supply and density constraints. The excess-power score of 48/100 signals inadequate marginal capacity to absorb incremental demand, while the constraint rating of 42/100 indicates significant limitations on deployment velocity—likely reflecting transmission bottlenecks, interconnection lead times, or insufficient utility infrastructure upgrades. For prospective buyers, this combination translates to elevated capex risk: new capacity additions will face either extended grid connection timelines or expensive localized infrastructure remediation. Operators considering expansion should model conservative commissioning schedules and negotiate long-term power SLAs with elevated contingency buffers.
Deal flow into Council Bluffs remains absent from tracked activity, a pattern consistent with peer Midwestern markets including Sioux City and Douglasville, where AVOID verdicts likewise correspond to dormant M&A pipelines. No recent transactions have been recorded in the market. Google and CyrusOne's combined 11-of-20 facility count suggests organic growth and internal capital deployment rather than portfolio consolidation through acquisition. The absence of third-party investment or hyperscaler acquisition activity indicates that capital allocation decisions favor markets with higher DCPI scores or established hyperscaler anchors that offset infrastructure constraints.
Market entry timing remains unfavorable absent material improvements to grid capacity or power supply agreements that would lift the excess-power constraint above 60/100.