Valero Wiserman

Valero

Valero Wiserman is a data center operated by Valero in San Antonio, TX, US. The facility is currently operational. It sits in the San Antonio data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 62.4-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
San Antonio
State
TX
Country
US
Coordinates
29.4742, -98.6801

Market intelligence

CAUTION

Data Center Power Index verdict for San Antonio — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on San Antonio — the market this facility sits in (full deep-dive →).

San Antonio's data center market comprises 81 tracked facilities totaling 1,797 MW, with Microsoft commanding the largest footprint at 12 sites, followed by CyrusOne, Unknown operators, and Vantage Data Centers at 9, 9, and 4 facilities respectively. The market's excess-power score of 64/100 indicates meaningful available capacity, though this abundance is tempered by a constraint score of 59/100—a mid-range reading that signals emerging bottlenecks in grid infrastructure, real estate availability, or interconnection pathways. The DCPI verdict of CAUTION warrants selective rather than aggressive deployment. For buyers, this dual signal means excess capacity exists to absorb new supply, but operational frictions are intensifying. The constraint component suggests that aggressive expansion will face headwinds—whether transmission limitations, land scarcity, or permitting delays—that could…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketSan Antonio
Grid operatorERCOT
DC Hub Power IndexCAUTION
Est. time to power62.4 months
LocationSan Antonio, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Valero Wiserman in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Google Fiber Inc.Zayo

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 31 operating generating units totalling 4,384 MW within about 50 km of San Antonio, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,833 MW · 14 units · 65%
Coal1,444 MW · 2 units · 33%
Utility-Scale Solar107 MW · 15 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in San Antonio tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 21,500+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="valero-valero-wiserman-fc41f2aa" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=valero-valero-wiserman-fc41f2aa
Schema, units and the population behind every count: https://dchub.cloud/bind