Verizon Arlington is a data center in Memphis, US. The facility is currently announced. It sits in the Memphis data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Memphis — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Memphis — the market this facility sits in (full deep-dive →).
Memphis operates 33 tracked facilities totaling 5,600 MW, positioning it as a mid-tier regional hub. However, the DCPI assessment reveals structural constraints: an excess-power score of 35/100 and a constraint score of 28/100 together signal a market approaching saturation despite absolute capacity. The operator landscape is fragmented, with xAI holding the largest footprint at 7 facilities, followed by DataBank entities 3 combined and single-facility operators including EdgeConneX and CenturyLink Memphis. This distribution reflects the market's transition from pure colocation to hyperscaler-driven deployments. The AVOID verdict is unambiguous for acquisition-stage investors. A constraint score of 28/100 indicates that available power infrastructure cannot reliably absorb new capacity additions; the 35/100 excess-power rating suggests that while some power exists, it is either poorly…
Published DC Hub data for this location.
Comparable facilities in Memphis tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="verizon-arlington-e52333fa" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=verizon-arlington-e52333fa