Vantage WA11 is a data center in US. The facility is currently operational. It sits in the Quincy data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 19.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Quincy — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Quincy — the market this facility sits in (full deep-dive →).
Quincy hosts a fragmented 1,507 MW portfolio across 81 tracked facilities, but power availability remains the critical constraint. The market is dominated by a long tail of operators—the top five control only 55 of the 81 sites, with an operator tagged "Unknown" managing 16 facilities—suggesting either legacy portfolios, smaller regional players, or asset opacity. Vantage Data Centers operates 7 sites, Microsoft 6, and H5 Data Centers 4, indicating neither hyperscaler nor dedicated operator concentration. No recent M&A activity has been recorded, pointing to either market maturity or investor hesitation. The DCPI verdict of AVOID is unambiguous for acquisition-stage investors, driven by a constraint score of 55/100 that reflects genuine power infrastructure limitations. While the excess-power score of 49/100 suggests moderate utilization headroom, the binding constraint—power delivery…
Published DC Hub data for this location.
DC Hub tracks 7 operating generating units totalling 3,604 MW within about 50 km of US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.