Vantage Phoenix PH2 is a data center operated by Vantage in Goodyear, AZ, US. It carries a reported power capacity of 75.0 MW and is currently operational. It sits in the Goodyear data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 12.4-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Goodyear — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Goodyear — the market this facility sits in (full deep-dive →).
Goodyear hosts a moderately consolidated operator base across 1,148 MW of capacity distributed among 25 tracked facilities. Microsoft operates the largest footprint with 7 facilities, followed by Vantage Data Centers with 6 and Vantage with 5, creating a three-player nucleus that controls roughly 56% of tracked capacity. The market's power infrastructure remains substantially underutilized relative to available grid capacity, positioning Goodyear as one of Arizona's few remaining greenfield-adjacent submarkets with room for expansion. No significant M&A activity has been recorded in the tracked dataset, suggesting an absence of portfolio consolidation or competitive repositioning among existing operators. The DCPI verdict of BUILD is driven by a critical imbalance: excess-power scores 68/100 while constraint registers only 37/100, indicating abundant available grid capacity with minimal…
Published DC Hub data for this location.
Comparable facilities in Goodyear tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="vantage-vantage-phoenix-ph2-bdba3481" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=vantage-vantage-phoenix-ph2-bdba3481