Vantage Data Center FRA31

Vantage
📍

Vantage Data Center FRA31 is a data center operated by Vantage. The facility is currently operational. It sits in the Frankfurt data-center market on the ENTSOE-DE grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 117.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Coordinates
50.0165, 8.4565

Market intelligence

AVOID

Data Center Power Index verdict for Frankfurt — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Frankfurt — the market this facility sits in (full deep-dive →).

Frankfurt's market shows acute structural imbalance: 291 tracked facilities totaling 2,240 MW are operating under severe power constraints that outweigh available capacity. The excess-power rating of 22/100 signals critical undersupply relative to demand, while the constraint score of 72/100 indicates that grid and infrastructure bottlenecks are the binding constraint, not buildable space. This dual squeeze—minimal spare power and maximum friction in deployment—creates a buyers' trap dressed as a sellers' market. The DCPI verdict of AVOID is categorical for acquisition-focused capital. A constraint rating of 72/100 means that closing a deal on paper provides no guarantee of operational power within reasonable timeframes; permitting, grid interconnection, and utility capacity upgrades are likely to extend project timelines by 12–24 months beyond typical Frankfurt precedent. For investors…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketFrankfurt
Grid operatorENTSOE-DE
DC Hub Power IndexAVOID
Est. time to power117.6 months

Power generation nearby

DC Hub tracks 237 operating generating units totalling 5,217 MW within about 50 km of this location. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,952 MW · 33 units · 57%
Wind887 MW · 50 units · 17%
Coal757 MW · 4 units · 15%
Utility-Scale Solar464 MW · 146 units · 9%
Bioenergy156 MW · 4 units · 3%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="vantage-vantage-data-center-fra31-7b92abe0" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=vantage-vantage-data-center-fra31-7b92abe0
Schema, units and the population behind every count: https://dchub.cloud/bind