中国联通广东云数据中心(广州新广基地) is a data center in Guangzhou, CN. The facility is currently operational.
中国联通广东云数据中心(广州新广基地) is one of 216 facilities DC Hub’s Hong Kong brief counts on the CLP grid. The closest tracked facility is 万国数据广州南沙数据中心, about 2 km away. Read the Hong Kong market brief →
Published DC Hub data for this location.
DC Hub tracks 261 operating generating units totalling 44,210 MW within about 50 km of Guangzhou, CN. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
get_facility slug="zhong-guo-lian-tong-yan-dong-yun-shu-ju-zhong-xin-yan-zhou-xin-yan-ji-di-9e2051ee" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect