Juniper is a data center in Portland, US. The facility is currently operational. It sits in the Beaverton data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 16.6-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Beaverton — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Beaverton — the market this facility sits in (full deep-dive →).
Beaverton's data center footprint remains minimal, with five tracked facilities totaling zero operational MW across a duopoly anchored by Digital Fortress. The market's operator concentration—Digital Fortress holds four of five tracked facilities—creates a narrow competitive landscape with limited diversification. Ziply Fiber's single-facility presence represents the only alternative operator, leaving Beaverton dependent on a single dominant player for capacity decisions and pricing power. The DCPI verdict of CAUTION reflects a structural imbalance: excess-power scoring at 52/100 paired with constraint at 43/100 signals that while power supply exists, meaningful operational or infrastructure constraints prevent full utilization. For acquisition-focused investors, this combination demands heightened due diligence. The excess-power reading suggests capacity headroom, but the constraint…
Published DC Hub data for this location.
DC Hub tracks 70 operating generating units totalling 503 MW within about 50 km of Portland, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Portland tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="juniper-juniper-2455727b" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect