Turkcell Edirne Veri Merkezi is a data center operated by Turkcell in Kapitan Andreevo, Svilengrad, TR. The facility is currently operational.
The closest tracked facility is Turkcell Edirne Veri Merkezi, under 1 km away.
Published DC Hub data for this location.
DC Hub tracks 49 operating generating units totalling 313 MW within about 50 km of Kapitan Andreevo, TR. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
get_facility slug="turkcell-edirne-veri-merkezi-kapitan-andreevo-b7cf9e03" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect