Telus

📍 CA

Telus is a data center in CA. The facility is currently operational. It sits in the Williston, ND data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 8.4-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.

Status
Operational
Country
CA

Market intelligence

BUILD

Data Center Power Index verdict for Williston, ND — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Williston, ND — the market this facility sits in (full deep-dive →).

Williston's data center market remains nascent, with only 40 MW deployed across two tracked facilities. The region currently hosts a single operator—Crusoe Energy—managing both sites, indicating a concentrated and early-stage competitive landscape. This limited footprint reflects Williston's traditional identity as an oil and gas hub rather than a mature tech infrastructure node, though the market's energy profile is now attracting digital infrastructure investment. The DCPI verdict of BUILD excess-power 71/100, constraint 15/100 strongly favors greenfield development over acquisition. The excess-power score of 71/100 signals abundant, underutilized generating capacity—a critical asset in a region with legacy energy infrastructure and low current data center demand. Conversely, the constraint score of 15/100 indicates minimal physical, regulatory, or interconnection barriers to facility…

Location

Area CA

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketWilliston, ND
Grid operatorMISO
Data Center Power IndexBUILD
Est. time to power8.4 months
Nearest substationover 25 km

Power generation nearby

DC Hub tracks 5 operating generating units totalling 907 MW within about 50 km of CA. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal703 MW · 3 units · 77%
Wind199 MW · 1 unit · 22%
Geothermal5 MW · 1 unit · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON