Telstra Wellington Exchange is a data center in Perth, AU. The facility is currently announced. It sits in the Perth data-center market on the AEMO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 32.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Perth — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Perth — the market this facility sits in (full deep-dive →).
Perth's data center market comprises 50 tracked facilities delivering 260 MW of installed capacity, anchored by a fragmented operator base led by Equinix with 5 facilities across the city. The market's DCPI metrics reveal structural stress: excess-power availability sits at only 35/100, indicating tight supply conditions, while the constraint score of 56/100 signals moderate-to-severe barriers to expansion. Recent periphery activity—including AsiaPhos's proposed acquisition and expansion of a Perth facility from 2 MW to 8 MW, and the AU$13.13 million sale of a 1 MW Vocus-occupied site—reflects speculative interest in marginal capacity rather than anchor-tenant deployments. The AVOID verdict for Perth is unambiguous for acquisition-focused operators and financial buyers. The combination of constrained power availability 35/100 and moderate operational constraints 56/100 creates a…
Published DC Hub data for this location.
Comparable facilities in Perth tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="telstra-wellington-exchange-2ad34a0a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=telstra-wellington-exchange-2ad34a0a