Telstra Sycs1 is a data center operated by Telstra in Sydney, AU. The facility is currently announced. It sits in the Sydney data-center market on the AEMO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 36.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Sydney — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Sydney — the market this facility sits in (full deep-dive →).
Sydney's data center market comprises 183 tracked facilities totaling 2,645 MW of capacity, with Equinix commanding the largest footprint at 15 facilities. The market is heavily concentrated among top-tier operators—Equinix, AirTrunk, and Macquarie collectively control a substantial portion of deployable infrastructure. Constraint pressures are acute: the DCPI verdict of AVOID reflects an excess-power score of just 33/100 paired with a constraint score of 67/100, signaling that available grid headroom is severely limited relative to current and near-term demand. For acquisition-focused investors and operators, the DCPI verdict is unambiguous: avoid near-term greenfield or brownfield entry. A constraint score of 67/100 indicates that power availability—not land or construction capacity—is the binding constraint. Buyers entering Sydney face a two-to-three-year wait for grid infrastructure…
Published DC Hub data for this location.
Comparable facilities in Sydney tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="telstra-sycs1-f131469e" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=telstra-sycs1-f131469e