Switch Tahoe Reno - The Citadel Campus is a data center operated by Switch in McCarran, NV, US. The facility is currently operational. It sits in the McCarran data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 10.6-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for McCarran — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on McCarran — the market this facility sits in (full deep-dive →).
McCarran's data center market remains undercapitalized and fragmented, with only 6 MW across 38 tracked facilities—a density that signals early-stage infrastructure development. The excess-power score of 50/100 indicates marginal availability of electrical supply, while the constraint rating of 37/100 reflects moderate but not severe limitations in interconnection, cooling, or other hard infrastructure. Operationally, the market is highly dispersed: unknown operators control 16 facilities, followed by two operators holding 14 MW and 6 MW respectively, with EdgeCore Digital Infrastructure and Switch, Ltd. each managing single-MW assets. For acquisition-focused investors, the CAUTION verdict reflects a genuine bifurcation of risk. The excess-power positioning suggests that power procurement—typically the primary barrier to entry in mature markets like Northern Virginia—is not the limiting…
Published DC Hub data for this location.
Comparable facilities in McCarran tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="switch-tahoe-reno-the-citadel-campus-235d6b3d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=switch-tahoe-reno-the-citadel-campus-235d6b3d