Stack Phoenix 1 is a data center operated by Stack in Phoenix, AZ, US. It carries a reported power capacity of 52.0 MW and is currently operational. It sits in the Phoenix data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 42.0-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Phoenix — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Phoenix — the market this facility sits in (full deep-dive →).
Phoenix's data center market comprises 251 tracked facilities totaling 4,922 MW, positioning it as a significant regional hub, yet the DCPI verdict of CAUTION reflects structural headwinds that complicate investment theses. The market's excess-power score of 62/100 suggests adequate generation capacity, but the constraint score of 67/100 signals meaningful limitations in grid interconnection, transmission, or land availability that offset apparent supply. This divergence—surplus power coupled with moderate constraint friction—creates an asymmetric risk profile uncommon in emerging markets. For acquisition-focused investors, the CAUTION verdict should inform deal structuring and hold periods. A constraint score of 67/100 means that purchasing existing facilities offers limited expansion upside; capex deployed toward organic growth or power infrastructure may face regulatory delays or…
Published DC Hub data for this location.
Comparable facilities in Phoenix tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="stack-phoenix-1-ff5c2c70" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=stack-phoenix-1-ff5c2c70