Skybox Datacenters Houston Campus is a data center in Houston, US. The facility is currently announced. It sits in the Houston data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 63.9-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Houston — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Houston — the market this facility sits in (full deep-dive →).
Houston's hyperscale data center footprint spans 1,075 MW across 87 tracked facilities, positioning it as a mid-tier regional hub with fragmented operator control. CyrusOne and DataBank each operate five facilities, while ServerFarm commands four, indicating no single dominant player. The market remains geographically dispersed with a relatively shallow M&A pipeline—recent deal activity totals roughly $10.2M in tracked transactions, suggesting limited liquidity or consolidation pressure relative to facility count. The DCPI verdict of CAUTION reflects structural tension between available power 65/100 and physical/permitting constraints 57/100. For acquisition-focused investors, this signals neither clear distress nor robust expansion headroom. The excess-power score indicates generation capacity is not yet saturated, but the constraint ceiling at 57/100 warns that real estate,…
Published DC Hub data for this location.
Comparable facilities in Houston tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="skybox-datacenters-houston-campus-9c9939c6" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=skybox-datacenters-houston-campus-9c9939c6