ServerFarm Covington is a data center operated by ServerFarm in Covington, GA, US. It carries a reported power capacity of 60.0 MW and is currently planned. It sits in the Social Circle data-center market on the SOCO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 29.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Social Circle — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Social Circle — the market this facility sits in (full deep-dive →).
Social Circle hosts 80 MW across three tracked facilities, with Meta operating two sites and Meta Platforms operating one. The market remains modest in absolute terms and shows no signs of recent consolidation activity. The DCPI framework assigns this market an excess-power score of 35/100 and constraint score of 48/100, placing it firmly in AVOID territory for acquisition-focused investors. For buyers, the AVOID verdict reflects a market where growth is structurally constrained despite apparent power availability. A constraint score of 48/100 indicates that non-power infrastructure—grid interconnection capacity, transmission infrastructure, land zoning, or interconnection queue position—presents binding limitations on expansion or throughput optimization at existing facilities. This means that acquiring an operational asset in Social Circle would not translate to meaningful utilization…
Published DC Hub data for this location.
Comparable facilities in Covington tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="serverfarm-covington-634d02fe" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=serverfarm-covington-634d02fe