National Center for High-performance Computing FOX Hsinchu

National Center for High-performance Computing

FOX Hsinchu is a data center operated by National Center for High-performance Computing in Hsinchu, TW. The facility is currently operational. It sits in the Taipei data-center market on the TAIPOWER grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 32.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Hsinchu
Country
TW
Coordinates
24.7825, 120.9958
Address
No. 7, R&D 6th Rd., East Dist.

Market intelligence

AVOID

Data Center Power Index verdict for Taipei — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Taipei — the market this facility sits in (full deep-dive →).

Taipei's data center market remains severely undersupplied, with just 44 tracked facilities delivering 7 MW of total capacity across a fragmented operator base. The excess-power score of 20/100 reflects acute capacity scarcity, indicating that available power resources fall far short of demand. The constraint rating of 59/100 signals material operational and expansion friction, placing Taipei among the most restricted markets in the region. This dual pressure—both insufficient power surplus and high structural constraints—creates a market where growth is artificially capped rather than naturally throttled. For acquisition-focused investors, the DCPI verdict of AVOID is definitive. The 20/100 excess-power rating means there is minimal room to absorb incremental tenant demand or operational flexibility; any near-term expansion will require either power infrastructure upgrades lengthy and…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketTaipei
Grid operatorTAIPOWER
DC Hub Power IndexAVOID
Est. time to power32.2 months
LocationHsinchu, TW

Power generation nearby

DC Hub tracks 128 operating generating units totalling 15,898 MW within about 50 km of Hsinchu, TW. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas11,658 MW · 20 units · 73%
Coal2,863 MW · 8 units · 18%
Wind871 MW · 22 units · 5%
Hydropower210 MW · 3 units · 1%
Utility-Scale Solar155 MW · 70 units · 1%
Bioenergy142 MW · 5 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Hsinchu tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="national-center-for-high-performance-computing-fox-hsinchu-24d2b964" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=national-center-for-high-performance-computing-fox-hsinchu-24d2b964
Schema, units and the population behind every count: https://dchub.cloud/bind