MIDLANDS DATA CENTER is a data center in PAPILLION, NE. The facility is currently active. It sits in the Papillion data-center market on the SPP grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 13.1-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Papillion — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Papillion — the market this facility sits in (full deep-dive →).
Papillion hosts 100 MW across 12 tracked facilities, establishing a mid-sized but operationally fragmented regional hub. Google and LightEdge Solutions operate anchor facilities alongside smaller regional players including Fireball Group LLC Data Center, LightEdge Data Center, and Midlands Data Center. The operator base remains highly distributed with no single entity commanding majority control, indicating competitive market entry conditions rather than consolidated infrastructure dominance. The DCPI BUILD verdict—driven by a 68/100 excess-power score paired with a constraint rating of 35/100—signals clear acquisition readiness for power-hungry workloads. This combination means Papillion possesses available electrical capacity without severe interconnection or transmission bottlenecks that would restrict utilization. For buyers, the verdict suggests Papillion is a viable platform for…
Published DC Hub data for this location.
Comparable facilities in PAPILLION tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="midlands-data-center-77000a1c" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=midlands-data-center-77000a1c