Midcon Recovery Solutions B3 Data Center is a data center operated by Midcon Recovery Solutions in Oklahoma City, OK, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Oklahoma City data-center market on the SPP grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 22.4-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Oklahoma City — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Oklahoma City — the market this facility sits in (full deep-dive →).
Oklahoma City operates a fragmented market with 20 tracked facilities totaling 17 MW across a small operator base anchored by Verizon 2 facilities, TierPoint 2, and single-site players including Fulltel, Kvchosting, and Google's Mayes County presence. The DCPI excess-power score of 76/100 reflects available generation capacity, while the constraint index of 47/100 signals moderate infrastructure bottlenecks—a profile that tips decisively toward near-term development. The BUILD verdict reflects a market primed for entry but not yet saturated. The 76/100 excess-power reading indicates Oklahoma City's abundant natural gas generation and regional transmission capacity can support incremental load without requiring new backbone infrastructure—a cost advantage for operators. Conversely, the 47/100 constraint score warns that last-mile power distribution and local network interconnection…
Published DC Hub data for this location.
Comparable facilities in Oklahoma City tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="midcon-recovery-solutions-b3-data-center-a1860b3c" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=midcon-recovery-solutions-b3-data-center-a1860b3c