Microsoft TRP1 — San Antonio Data Center

Microsoft TRP1 is a data center operated by Microsoft in San Antonio, TX, US. The facility is currently operational. It sits in the San Antonio data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 28.3-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
San Antonio
State
TX
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for San Antonio — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on San Antonio — the market this facility sits in (full deep-dive →).

San Antonio's data center footprint spans 81 tracked facilities totaling 1,797 MW, anchored by Microsoft's 12-facility presence and a fragmented competitive landscape including CyrusOne, Vantage Data Centers, and a significant "Unknown" operator cohort. The market is mid-sized relative to tier-one Texas metros, with no recent M&A transactions recorded, signaling a pause in consolidation activity. Power availability and grid constraint dynamics remain the dominant risk vectors. The DCPI verdict of CAUTION—specifically excess-power at 64/100 paired with constraint at 53/100—reflects a market with adequate but tightening power surplus and emerging grid friction. For buyers, this translates to actionable but bounded opportunity: power supply is not scarce enough to justify premium valuations, yet constraint pressures are substantial enough to require due diligence on interconnection…

Location

Area San Antonio, TX, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketSan Antonio
Grid operatorERCOT
DC Hub Power IndexCAUTION
Est. time to power28.3 months
LocationSan Antonio, US
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around Microsoft TRP1 in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Microsoft

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 25 operating generating units totalling 4,377 MW within about 50 km of San Antonio, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,833 MW · 14 units · 65%
Coal1,444 MW · 2 units · 33%
Utility-Scale Solar100 MW · 9 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in San Antonio tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 24,400+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="microsoft-trp1-san-antonio-baa2db65" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind