Meta Rosemount Data Center is a data center operated by Meta Platforms in Rosemount, MN, US. It carries a reported power capacity of 100.0 MW and is currently planned. It sits in the Chaska data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 18.1-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Chaska — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Chaska — the market this facility sits in (full deep-dive →).
Chaska's data center market remains nascent and severely undercapitalized, with only four tracked facilities totaling 0 MW of operational capacity. The market is fragmented across three operators—Flexential operates two sites, while Flexential Corp. and Stream Data Centers each operate one. The absence of any measurable installed base underscores the market's early-stage status and suggests that current facilities are either in development, conversion, or classified under parent company structures that obscure capacity reporting. The DCPI verdict of AVOID is decisive and warrants serious weight from acquisition-focused capital. Chaska's excess-power score of 49/100 falls below the 60-point threshold typically required to signal reliable power availability, indicating structural constraints in grid capacity, interconnection timelines, or utility headroom. The constraint score of 39/100…
Published DC Hub data for this location.
Comparable facilities in Rosemount tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="meta-platforms-meta-rosemount-data-center-135c4a9a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=meta-platforms-meta-rosemount-data-center-135c4a9a