Meta Gallatin Building 3 is a data center operated by Meta Platforms in Gallatin, TN, US. It carries a reported power capacity of 34.0 MW and is currently under construction. It sits in the Memphis data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Memphis — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Memphis — the market this facility sits in (full deep-dive →).
Memphis operates 33 tracked facilities totaling 5,600 MW across a fragmented operator base, with xAI commanding the largest footprint at seven facilities. The market's excess-power score of 35/100 signals chronic undersupply relative to current and near-term demand, while the constraint score of 28/100 reflects severe limitations on buildable capacity or grid headroom. This combination produces a DCPI verdict of AVOID, indicating structural headwinds that favor neither acquisition nor expansion strategies in the near term. For acquisition-focused investors, the DCPI rating is unambiguous: pass. The 35/100 excess-power score means available capacity cannot reliably service new tenant workloads without substantial infrastructure investment upstream—grid interconnection delays, transmission upgrades, or on-site generation. The constraint score of 28/100 is more acute: it signals that even…
Published DC Hub data for this location.
Comparable facilities in Gallatin tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="meta-platforms-meta-gallatin-building-3-fc621c67" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=meta-platforms-meta-gallatin-building-3-fc621c67