Meta Bowling Green Data Center is a data center. The facility is currently operational. It sits in the Luckey data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 15.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Luckey — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Luckey — the market this facility sits in (full deep-dive →).
Luckey's data center footprint remains nascent, with only 4 tracked facilities totaling 0 MW across a fragmented operator base. The market is characterized by minimal consolidation, with facilities distributed among Meta, Amplex Electric Inc., and two operators of unknown scale. No recent M&A activity has been recorded in the market, and the absence of a clear anchor tenant or dominant operator suggests the market is still in formation with limited institutional attention. The DCPI verdict of AVOID carries material weight for acquisition-focused investors. Both excess-power and constraint scores register at 39/100, indicating a market caught between competing structural headwinds—insufficient available capacity for growth-stage operators while simultaneously facing grid-level congestion that limits expansion economics. This symmetrical weakness suggests that entering Luckey requires…
Published DC Hub data for this location.
DC Hub tracks 40 operating generating units totalling 7,214 MW within about 50 km of this location. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
get_facility slug="meta-bowling-green-data-center-1ca42b2c" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=meta-bowling-green-data-center-1ca42b2c