Logica Torino Milano is a data center in Milan, IT. The facility is currently announced. It sits in the Milan data-center market on the ENTSOE-IT grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 93.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Milan — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Milan — the market this facility sits in (full deep-dive →).
Milan's data center market is materially constrained despite representing Italy's largest hub, with 125 tracked facilities totaling 435 MW across a fragmented operator base. The market's DCPI score reflects critical infrastructure limitations: excess power capacity stands at only 16/100, while constraint pressure reaches 67/100—a combination that signals acute grid and real estate bottlenecks. These metrics place Milan in a vulnerable position relative to competing European markets, where power availability and expansion headroom typically exceed 40/100 on the excess-power dimension. For acquisition-focused investors, the AVOID verdict is categorical and operationally justified. The constraint score of 67/100 indicates that growth capital deployed today faces immediate friction: grid interconnection timelines are extended, power pricing is volatile, and facility expansion faces…
Published DC Hub data for this location.
Comparable facilities in Milan tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="logica-torino-milano-c299e587" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=logica-torino-milano-c299e587