Kedia Infotech Kedia Data Center is a data center in Hyderabad, IN. The facility is currently announced. It sits in the Hyderabad data-center market on the POSOCO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 65.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Hyderabad — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Hyderabad — the market this facility sits in (full deep-dive →).
Hyderabad's data center ecosystem remains severely undercapitalized relative to demand signals. The tracked market spans 39 facilities across 40 MW of operational capacity—a footprint that ranks among India's smallest for a Tier-1 tech hub. CtrlS Datacenters Ltd operates the largest portfolio with 3 facilities, followed by Microsoft and Unknown operators with 2 facilities each, while AWS and CtrlS maintain single-asset positions. This fragmented operator base, coupled with minimal installed capacity, reflects a market in early maturation rather than saturation. The DCPI verdict of AVOID is decisive for acquisition-focused capital. The excess-power score of 24/100 signals acute undersupply—demand outpaces available rack capacity and utility headroom by a substantial margin. Critically, the constraint score of 65/100 indicates that power infrastructure poses a binding limitation on…
Published DC Hub data for this location.
Comparable facilities in Hyderabad tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="kedia-infotech-kedia-data-center-003189f1" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=kedia-infotech-kedia-data-center-003189f1