IT is a data center in Tustin, CA, US. The facility is currently operational. It sits in the Tustin data-center market on the CAISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 38.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Tustin — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Tustin — the market this facility sits in (full deep-dive →).
Tustin's data center footprint remains nascent, with only 3 tracked facilities totaling 0 MW across a fragmented operator base. The market shows material structural stress: excess-power availability scores 60/100 while grid constraints register 58/100, indicating simultaneous supply glut and transmission bottlenecks. This paradox—abundant generation capacity paired with limited ability to route power to end-users—creates an asymmetric risk profile that distinguishes Tustin from straightforward underserved markets. The three-way operator split among two named players and one unidentified entity suggests either portfolio churn or data gaps, both red flags for market transparency. The CAUTION verdict reflects genuine structural friction rather than cyclical softness. Excess-power scoring above 50 typically signals oversupply relative to near-term tenant demand, yet constraint scoring…
Published DC Hub data for this location.
DC Hub tracks 101 operating generating units totalling 3,801 MW within about 50 km of Tustin, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Tustin tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="it-c8dd9d10" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=it-c8dd9d10