Irongate Data Centers Twin Cities East is a data center operated by Irongate Data Centers Twin Cities in Minneapolis, US. The facility is currently announced. It sits in the Minneapolis data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 21.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Minneapolis — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Minneapolis — the market this facility sits in (full deep-dive →).
Minneapolis hosts 173 MW across 78 tracked facilities, a modest footprint dominated by Cologix, which operates 12 MW through its primary and subsidiary entities. The market remains fragmented—DataBank runs 6 MW, leaving significant capacity distributed among smaller operators. This lean, decentralized structure reflects a market that has yet to consolidate at scale, distinguishing it from mature coastal hubs where single operators anchor 500+ MW portfolios. The DCPI verdict of AVOID reflects a market caught in structural constraint despite nominal power availability. Both excess-power and constraint metrics register 48/100—a rare equilibrium that signals false comfort. The balanced score masks a critical problem: available power exists, but delivery infrastructure, interconnect density, and grid resilience do not support elastic growth. For acquisition-focused investors, this verdict…
Published DC Hub data for this location.
Comparable facilities in Minneapolis tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="irongate-data-centers-twin-cities-east-7ec72201" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=irongate-data-centers-twin-cities-east-7ec72201