iM Critical Miami

iM Critical

iM Critical Miami is a data center operated by iM Critical in Miami, FL, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Miami data-center market on the FRCC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
3.0 MW
Status
Operational
Market
Miami
State
FL
Country
US
Coordinates
25.8484, -80.1949

Market intelligence

AVOID

Data Center Power Index verdict for Miami — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Miami — the market this facility sits in (full deep-dive →).

Miami's data center market consists of 248 MW across 106 tracked facilities, positioning it as a mid-sized regional hub with fragmented operator ownership. The top five operators—Equinix 7 facilities, CoreSite 3, DataBank 3, and 3HCLOUD LLC 2—collectively control approximately 38% of tracked capacity, indicating significant market consolidation potential. The recent acquisition of Hydra Host for an undisclosed sum signals ongoing M&A interest, though deal velocity remains modest compared to institutional capital flows into larger Sunbelt markets. The DCPI verdict of AVOID stems from a critical infrastructure imbalance: excess-power availability scores 41/100 while constraint severity reaches 50/100. This combination creates a structural headwind for acquisition-focused investors. While 248 MW appears substantial, the constraint score signals that power infrastructure—whether grid…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketMiami
Grid operatorFRCC
DC Hub Power IndexAVOID
Est. time to power17.9 months
LocationMiami, US
Reported capacity3.0 MW

Other data centers nearby

Comparable facilities in Miami tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 18,500+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="im-critical-miami-af04014d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=im-critical-miami-af04014d