Ibm Carnaxide is a data center in Lisbon, PT. The facility is currently announced. It sits in the Lisbon data-center market on the ENTSOE-PT grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 58.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Lisbon — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Lisbon — the market this facility sits in (full deep-dive →).
Lisbon's data center market remains nascent, with 36 tracked facilities totaling 10 MW across a fragmented operator base. Equinix holds the largest footprint with 4 facilities, while NOS, Equinix Inc., Claranet Lisbon, and Dotsi operate smaller deployments of 1–2 facilities each. The market has recorded no recent M&A activity, and capacity remains tightly distributed across a competitive but undercapitalized ecosystem. The DCPI verdict of AVOID carries direct implications for acquisition-oriented investors. The excess-power score of 24/100 indicates severe demand weakness relative to available supply—a structural headwind for buyer-side returns. Paired with a constraint score of 60/100, the market signals neither acute scarcity nor sufficient utilization momentum to justify entry valuations. Comparable constrained markets such as Paris 27/100 excess power, AVOID and Providence 31/100…
Published DC Hub data for this location.
Comparable facilities in Lisbon tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="ibm-carnaxide-851450d9" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=ibm-carnaxide-851450d9