Hostrunway Hostrunway is a data center in Houston, US. The facility is currently announced. It sits in the Houston data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 29.0-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Changes DC Hub has recorded to this facility’s record, newest first.
Data Center Power Index verdict for Houston — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Houston — the market this facility sits in (full deep-dive →).
Houston's installed base of 1,075 MW across 97 tracked facilities masks structural tightness: the market scores 65/100 on excess power but only 51/100 on constraint relief, signaling that available capacity exists without corresponding infrastructure to deploy it reliably. CyrusOne and DataBank each operate five facilities, establishing duopoly control of major hyperscaler-grade assets, while ServerFarm's four-site footprint and two operators with three facilities each fragment the mid-tier. The recent M&A registry shows two Amazon transactions at $10,000 each and one I Squared Capital deal valued at $225M, though deal specifics remain opaque in the available records. For acquisition-focused investors, the CAUTION verdict warrants disciplined entry. The 14-point gap between excess-power and constraint scores indicates a market where raw MW availability does not translate to immediate…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Houston tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="hostrunway-hostrunway-86dcb71f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect