H5 Data Centers Cincinnati II is a data center operated by H5 Data Centers in Cincinnati, OH, US. It carries a reported power capacity of 15.0 MW and is currently operational. It sits in the Cincinnati data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 39.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Cincinnati — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Cincinnati — the market this facility sits in (full deep-dive →).
Cincinnati's data center market is small and severely constrained: 31 tracked facilities totaling 101 MW across a fragmented operator base. CyrusOne operates the largest footprint with four facilities, followed by Flexential with three and a trio of regional operators H5, CenturyLink, Cincinnati Bell holding smaller stakes. This operator atomization reflects a market that has not attracted major hyperscale consolidation, and the absence of tracked M&A activity underscores limited deal velocity in the region. The DCPI verdict of AVOID is unambiguous for acquisition-focused investors. With excess power at 38/100—below the threshold for comfortable greenfield or retrofit economics—and constraint scored at 45/100, Cincinnati presents a dual friction trap. The excess-power score signals that new colocation capacity will face real grid headroom challenges; the constraint score indicates that…
Published DC Hub data for this location.
Comparable facilities in Cincinnati tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="h5-data-centers-cincinnati-ii-bb863671" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=h5-data-centers-cincinnati-ii-bb863671