Google is a data center in Red Oak, TX, US. The facility is currently operational. It sits in the Red Oak data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 33.0-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Changes DC Hub has recorded to this facility’s record, newest first.
Data Center Power Index verdict for Red Oak — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Red Oak — the market this facility sits in (full deep-dive →).
Red Oak's data center market is consolidating around a handful of operators managing 865 MW across 8 tracked facilities, with Compass variants controlling five of those properties. The market has absorbed significant capital investment—notably DataBank's $1.45 billion commitment to Red Oak—signaling confidence in the region's infrastructure and grid connectivity. Unlike adjacent Texas markets experiencing deal dormancy, Red Oak has demonstrated sustained operator interest, though recent M&A activity within the market itself remains untracked. The BUILD verdict excess-power: 65/100, constraint: 45/100 reflects a market with meaningful spare capacity but manageable infrastructure bottlenecks. For investors, this scoring pattern justifies greenfield development or acquisition of operating assets with expansion potential. The 65 excess-power rating indicates grid supply is not the limiting…
Published DC Hub data for this location.
Networks recorded as present at or immediately around Google in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 25 operating generating units totalling 7,666 MW within about 50 km of Red Oak, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Red Oak tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="google-red-oak-05a0afc1" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect