Frontier Tampa 4 is a data center operated by Frontier Tampa in Tampa, US. The facility is currently announced. It sits in the Tampa data-center market on the FRCC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Tampa — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Tampa — the market this facility sits in (full deep-dive →).
Tampa's data center infrastructure is fragmented and undersized, with 39 tracked facilities totaling 65 MW spread across a competitive operator base. Flexential dominates with 9 MW across two distinct entities, while Frontier Tampa operates 5 MW as the second-largest player. The remaining capacity is distributed among smaller operators including 365 Data Centers 2 MW, Carrier Core, and others, indicating no clear market consolidator. This fragmentation limits operational efficiency and scale economies typical of mature metros. The DCPI verdict of AVOID is structurally actionable for acquisition-focused investors. While the excess-power reading of 42/100 suggests available generation capacity, the constraint score of 46/100 signals that transmission, cooling, or zoning bottlenecks severely limit the ability to monetize that power. For buyers, this creates a paradox: apparent capacity…
Published DC Hub data for this location.
Comparable facilities in Tampa tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="frontier-tampa-4-68d14e8f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=frontier-tampa-4-68d14e8f