Frontier Charleston is a data center in Charleston, WV, US. The facility is currently announced. It sits in the Charleston data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 13.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Charleston — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Charleston — the market this facility sits in (full deep-dive →).
Charleston's data center market remains severely constrained, with only 4 tracked facilities totaling 0 MW of operational capacity across three fragmented operators. The market's critical weakness is reflected in a DCPI excess-power score of 32/100 paired with a constraint rating of 30/100—indicating both insufficient available power supply and significant physical or regulatory impediments to expansion. This dual deficit places Charleston among the weakest data center markets in the region, with no recent M&A activity to suggest investor confidence or consolidation momentum. For acquisition-focused investors and operators, the DCPI verdict of AVOID is unambiguous. The excess-power score of 32/100 signals that Charleston lacks the electrical infrastructure headroom required to support hyperscaler workloads or large-scale colocation deployment. More critically, the constraint score of…
Published DC Hub data for this location.
Comparable facilities in Charleston tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="frontier-charleston-bfdb9c99" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=frontier-charleston-bfdb9c99