Flexential Tampa/West TPA01 — Tampa Data Center

Flexential

Flexential - Tampa/West (TPA01/02) is a data center operated by Flexential in Tampa, FL, US. The facility is currently operational. It sits in the Tampa data-center market on the FRCC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Tampa
State
FL
Country
US
Coordinates
28.0370, -82.5409
Address
9417 Corporate Lake Dr

Market intelligence

AVOID

Data Center Power Index verdict for Tampa — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Tampa — the market this facility sits in (full deep-dive →).

Tampa's data center market remains undersized and constrained, with 44 tracked facilities totaling just 18 MW across a fragmented operator base. Flexential dominates with 9 MW across two legal entities Flexential and Flexential Corp., while Frontier Tampa operates 5 MW, and 365 Data Centers holds 2 MW. The remaining capacity is scattered among smaller players including Carrier Core, LLC. No recent M&A activity has been recorded in the market, reflecting limited investor appetite and minimal consolidation pressure. The DCPI verdict of AVOID carries unambiguous weight for acquisition-focused investors. An excess-power score of 41/100 paired with a constraint score of 46/100 signals a market trapped between undersupply and underutilization—neither condition creates attractive entry conditions. The near-parity between these scores indicates structural inefficiency rather than cyclical…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketTampa
Grid operatorFRCC
DC Hub Power IndexAVOID
Est. time to power17.0 months
LocationTampa, US

Power generation nearby

DC Hub tracks 61 operating generating units totalling 11,735 MW within about 50 km of Tampa, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas9,985 MW · 27 units · 85%
Utility-Scale Solar1,088 MW · 27 units · 9%
Coal486 MW · 1 unit · 4%
Bioenergy176 MW · 6 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Tampa tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="flexential-flexential-tampawest-tpa0102-c5c5c0d2" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=flexential-flexential-tampawest-tpa0102-c5c5c0d2
Schema, units and the population behind every count: https://dchub.cloud/bind