Flexential Nashville/Brentwood NAS01 — Brentwood Data Center

Flexential

Flexential - Nashville/Brentwood (NAS01/04) is a data center operated by Flexential in Brentwood, TN, US. The facility is currently operational. It sits in the Brentwood data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 9.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Brentwood
State
TN
Country
US
Coordinates
35.9725, -86.8088
Address
7100 Commerce Way, Suite 25,

Market intelligence

AVOID

Data Center Power Index verdict for Brentwood — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Brentwood — the market this facility sits in (full deep-dive →).

Brentwood's data center footprint remains nascent and underdeveloped, with only 7 tracked facilities totaling 0 MW across the market. The operator base is fragmented, dominated by Flexential with two facilities and an equal number held by unknown operators, while Crown Castle Inc. and Flexential Corp. each maintain single-site presence. This distribution reflects an immature market lacking anchor tenants or consolidation momentum. The DCPI verdict of AVOID is unambiguous for acquisition-focused investors. An excess-power score of 35/100 signals chronic undersupply—the market cannot absorb additional infrastructure without substantial demand creation. The constraint score of 29/100 compounds this weakness, indicating that even existing capacity faces structural limitations in grid interconnection, water availability, or permitting pathways. Together, these metrics position Brentwood as a…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketBrentwood
Grid operatorTVA
DC Hub Power IndexAVOID
Est. time to power9.6 months
LocationBrentwood, US

Power generation nearby

DC Hub tracks 17 operating generating units totalling 2,157 MW within about 50 km of Brentwood, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal1,255 MW · 4 units · 58%
Oil/Gas664 MW · 8 units · 31%
Hydropower198 MW · 2 units · 9%
Utility-Scale Solar40 MW · 3 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Brentwood tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="flexential-flexential-nashvillebrentwood-nas0104-309ca4c4" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=flexential-flexential-nashvillebrentwood-nas0104-309ca4c4
Schema, units and the population behind every count: https://dchub.cloud/bind