Flexential Charlotte/North CLT4 — Charlotte Data Center

Flexential

Flexential - Charlotte/North (CLT4/5) is a data center operated by Flexential in Charlotte, NC, US. The facility is currently operational. It sits in the Charlotte data-center market on the SERC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 12.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Charlotte
State
NC
Country
US
Coordinates
35.3297, -80.7660
Address
10105 David Taylor Dr

Market intelligence

AVOID

Data Center Power Index verdict for Charlotte — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Charlotte — the market this facility sits in (full deep-dive →).

Charlotte's data center footprint remains minimal and undersized, with only 67 tracked facilities delivering 16 MW of total capacity across a fragmented operator base. Flexential leads with 9 facilities, while Digital Realty, TierPoint, and Segra Charlotte each operate 3 sites; the remainder are unidentified operators. The market's DCPI excess-power score of 37/100 signals severe undersupply relative to regional demand, while a constraint score of 34/100 indicates structural bottlenecks that prevent rapid capacity additions. For acquisition-focused investors, the DCPI verdict of AVOID is disqualifying. The combination of low excess-power and high constraint ratings means Charlotte lacks both immediate surplus capacity and the infrastructure elasticity needed to absorb new power commitments. Unlike markets where power constraints can be engineered around within 18–36 months, Charlotte's…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketCharlotte
Grid operatorSERC
DC Hub Power IndexAVOID
Est. time to power12.2 months
LocationCharlotte, US

Power generation nearby

DC Hub tracks 84 operating generating units totalling 12,086 MW within about 50 km of Charlotte, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Nuclear4,806 MW · 4 units · 40%
Oil/Gas4,185 MW · 22 units · 35%
Coal1,996 MW · 4 units · 17%
Utility-Scale Solar596 MW · 50 units · 5%
Hydropower503 MW · 4 units · 4%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Charlotte tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="flexential-flexential-charlottenorth-clt45-14d88d4f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=flexential-flexential-charlottenorth-clt45-14d88d4f
Schema, units and the population behind every count: https://dchub.cloud/bind