Fiducial Nexto Hq Datacenter is a data center in Marseille, FR. The facility is currently announced. It sits in the Marseille data-center market on the ENTSOE-FR grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 28.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Marseille — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Marseille — the market this facility sits in (full deep-dive →).
Marseille's data center footprint remains modest and undersupplied relative to regional demand. Across 42 tracked facilities, the market operates only 66 MW of total capacity—a constraint that becomes acute when measured against the Data Center Power Index verdict. The excess-power score of 29/100 signals severe undersupply; the constraint score of 58/100 indicates grid and infrastructure friction that compounds scarcity. Digital Realty operates the largest regional presence with 8 facilities, followed distantly by Orange with 2, while smaller independent operators including Asp Serveur La Ciotat, Colt Technology Services Marseille, and Aix-Marseille Université fragment the remaining supply. For acquisition-focused investors, the AVOID verdict is categorical. A constraint score of 58/100 places Marseille squarely in the high-friction zone: power interconnection delays, grid upgrade…
Published DC Hub data for this location.
Comparable facilities in Marseille tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="fiducial-nexto-hq-datacenter-b5c29467" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=fiducial-nexto-hq-datacenter-b5c29467