Fiber 23

Last updated

Fiber 23 is a data center operated by Fiber 23 S.R.L in Rome, Rome, IT. The facility is currently operational. It sits in the Rome data-center market on the ENTSOE-IT grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 84.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Rome
State
Rome
Country
IT

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Rome — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Rome — the market this facility sits in (full deep-dive →).

Rome's data center market is fragmented and constrained, with 42 tracked facilities totaling 120 MW distributed among five equally-sized operators. Digital Realty, Fiber 23 S.R.L, Camera Dei Deputati Rome, BT Rome, and Microsoft each operate 2 facilities, indicating an absence of market concentration typical of mature European hubs. The competitive atomization masks a deeper structural problem: excess power capacity is critically low at 12/100, while operational constraints score 61/100—a combination that signals resource scarcity rather than opportunity. The DCPI verdict of AVOID is unambiguous for acquisition-focused investors. An excess-power score of 12/100 means Rome's existing facilities are running near utilization ceiling with minimal headroom for new tenant workloads or infrastructure expansion. The constraint rating of 61/100 further reflects binding physical or regulatory…

Location

Area Rome, Rome, IT

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketRome
Grid operatorENTSOE-IT
Data Center Power IndexAVOID
Est. time to power84.2 months
LocationRome, IT

Power generation nearby

DC Hub tracks 41 operating generating units totalling 2,363 MW within about 50 km of Rome, IT. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,965 MW · 4 units · 83%
Utility-Scale Solar304 MW · 35 units · 13%
Hydropower49 MW · 1 unit · 2%
Bioenergy46 MW · 1 unit · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Rome tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="fiber-23-srl-fiber-23-78ec7e4d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind