Equinix

Last updated

Equinix is a data center in Sterling, VA, US. The facility is currently operational. It sits in the Sterling data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 39.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Northern Virginia
City
Sterling
State
VA
Country
US

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Sterling — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Sterling — the market this facility sits in (full deep-dive →).

Sterling's data center infrastructure spans 155 facilities totaling 2,766 MW, positioning it as a material hub within the Northern Virginia corridor. However, the market exhibits a critical operational imbalance: excess power availability scores 46/100 while grid constraints rate 53/100, creating a misalignment between capacity supply and grid delivery capability. This tension reflects the region's rapid colocation growth outpacing utility infrastructure expansion—a structural problem rather than cyclical weakness. The DCPI verdict of AVOID carries direct implications for acquisition strategists. A 46/100 excess-power score indicates limited room for margin expansion through utilization gains, while the 53/100 constraint rating suggests power delivery bottlenecks will persist in the near term, capping operational upside and increasing capex requirements for infrastructure augmentation.…

Location

Street Beaumeade Circle
Area Sterling, VA, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketSterling
Grid operatorPJM
Data Center Power IndexAVOID
Est. time to power39.0 months
LocationSterling, US
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around Equinix in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

123NET247rack.com365 Data Centers (BroadbandONE)8x8, Inc.ACE CDNADVANCED HOSTINGAFR-IX TelecomALIANZA-INCALTICORANTELANY DIGITAL PTE. LTDAS8882

Further networks are recorded at this location beyond those listed here.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 73 operating generating units totalling 2,396 MW within about 50 km of Sterling, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,913 MW · 4 units · 80%
Utility-Scale Solar262 MW · 64 units · 11%
Bioenergy221 MW · 5 units · 9%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Sterling tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="equinix-sterling-84be0aa9" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind