Equinix

Last updated

Equinix is a data center in Piscataway, NJ, US. The facility is currently operational. It sits in the Piscataway data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 15.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Piscataway
State
NJ
Country
US
Coordinates
40.5449, -74.4954

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Piscataway — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Piscataway — the market this facility sits in (full deep-dive →).

Piscataway's data center market consists of 25 tracked facilities totaling 80 MW across a fragmented operator base, but the region faces material constraints that limit near-term investment appeal. The market's excess-power score of 34/100 indicates insufficient grid capacity to support incremental demand, while a constraint rating of 35/100 signals tight operational headroom. QTS Realty operates the largest footprint with four facilities, while three operators remain unidentified in available tracking data, and a single Barclays Capital Data Center presence suggests limited institutional density. The absence of recent M&A activity underscores investor hesitance given these structural limitations. The DCPI verdict of AVOID carries direct implications for acquisition-focused investors: Piscataway lacks the power infrastructure to justify premium valuations typical of build-ready markets.…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketPiscataway
Grid operatorPJM
DC Hub Power IndexAVOID
Est. time to power15.0 months
LocationPiscataway, US
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around Equinix in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Digital Fortress - AS2044Digital Fortress - AS3361Digital Fortress - AS6423

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 280 operating generating units totalling 17,261 MW within about 50 km of Piscataway, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas16,391 MW · 61 units · 95%
Utility-Scale Solar692 MW · 214 units · 4%
Bioenergy178 MW · 5 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Piscataway tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 24,400+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="equinix-piscataway-dab017fd" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind