Equinix MI6 - Miami, Doral is a data center operated by Equinix in Doral, FL, US. It carries a reported power capacity of 18.0 MW and is currently operational. It sits in the Doral data-center market on the FRCC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 16.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Doral — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Doral — the market this facility sits in (full deep-dive →).
Doral's data center footprint remains constrained despite available power, with five tracked facilities totaling 64 MW dominated by a fragmented operator base. CoreSite, Equinix operating two separate assets, NocRoom Miami IT Services, and one unidentified operator each control discrete capacity nodes. The market shows no recent consolidation activity, leaving structural inefficiencies unresolved and limiting the emergence of a clear market leader capable of coordinated capacity development. The DCPI verdict of AVOID reflects a fundamental operational misalignment: excess-power scores of 42/100 signal available generation capacity, but constraint scores of 45/100 indicate that infrastructure bottlenecks—likely interconnection, cooling, or real estate availability—are binding more tightly than power supply. For acquisition-focused investors, this configuration is decisively unfavorable.…
Published DC Hub data for this location.
Comparable facilities in Doral tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="equinix-mi6-miami-doral-f4d62cb5" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=equinix-mi6-miami-doral-f4d62cb5