Equinix MI3 - Miami, Boca Raton is a data center operated by Equinix in Boca Raton, FL, US. It carries a reported power capacity of 18.0 MW and is currently operational. It sits in the Boca Raton data-center market on the FRCC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 16.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Boca Raton — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Boca Raton — the market this facility sits in (full deep-dive →).
Boca Raton's data center footprint remains minimal and constrained, with just 24 MW across 6 tracked facilities. The market is fragmented, dominated by regional operators like 365 Data Centers, Cogent Communications, and multiple Equinix entities, with no single player holding more than one facility. Power availability presents a false opportunity: the DCPI excess-power score of 42/100 suggests surplus capacity, but this is undermined by the constraint rating of 43/100, indicating that operational headroom is illusory. For acquisition-focused investors, the DCPI verdict of AVOID is operationally decisive. The near-parity between excess power and constraint metrics reveals a critical vulnerability: purchasing existing capacity in Boca Raton will not unlock material value because infrastructure constraints—likely grid interconnection capacity, backhaul fiber redundancy, or real estate…
Published DC Hub data for this location.
Comparable facilities in Boca Raton tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="equinix-mi3-miami-boca-raton-abe8243c" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=equinix-mi3-miami-boca-raton-abe8243c