Equinix MI2 - Miami is a data center operated by Equinix in Miami, FL, US. It carries a reported power capacity of 18.0 MW and is currently operational. It sits in the Miami data-center market on the FRCC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Miami — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Miami — the market this facility sits in (full deep-dive →).
Miami's data center market consists of 248 MW across 106 tracked facilities, positioning it as a mid-sized regional hub with fragmented operator ownership. The top five operators—Equinix 7 facilities, CoreSite 3, DataBank 3, and 3HCLOUD LLC 2—collectively control approximately 38% of tracked capacity, indicating significant market consolidation potential. The recent acquisition of Hydra Host for an undisclosed sum signals ongoing M&A interest, though deal velocity remains modest compared to institutional capital flows into larger Sunbelt markets. The DCPI verdict of AVOID stems from a critical infrastructure imbalance: excess-power availability scores 41/100 while constraint severity reaches 50/100. This combination creates a structural headwind for acquisition-focused investors. While 248 MW appears substantial, the constraint score signals that power infrastructure—whether grid…
Published DC Hub data for this location.
Comparable facilities in Miami tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="equinix-mi2-miami-d6220652" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=equinix-mi2-miami-d6220652