Equinix MA3 - Manchester, Joule House

Equinix

Equinix MA3 - Manchester, Joule House is a data center operated by Equinix in Manchester, GB. The facility is currently operational. It sits in the Manchester data-center market on the NGESO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 134.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Manchester
Country
GB
Coordinates
53.4687, -2.3104

Market intelligence

AVOID

Data Center Power Index verdict for Manchester — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Manchester — the market this facility sits in (full deep-dive →).

Manchester's data center footprint comprises 71 tracked facilities delivering 96 MW of total capacity, but the market is characterized by severe structural constraints that should deter acquisition-focused investors. The region's DCPI scores reveal the core problem: excess power availability sits at only 20/100, while infrastructure constraints score 70/100—a configuration that leaves virtually no operational flexibility for new or expanded workloads. This imbalance is not cyclical; it reflects hard physical limits on grid connectivity and cooling capacity that constrain the entire market. For acquisition investors, the DCPI verdict of AVOID is unambiguous and rooted in economic reality rather than cyclical weakness. Buying existing facilities in Manchester offers no arbitrage opportunity because the constraint profile prevents meaningful capacity expansion or workload densification. A…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketManchester
Grid operatorNGESO
DC Hub Power IndexAVOID
Est. time to power134.4 months
LocationManchester, GB

Power generation nearby

DC Hub tracks 96 operating generating units totalling 3,278 MW within about 50 km of Manchester, GB. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,534 MW · 18 units · 77%
Wind342 MW · 26 units · 10%
Utility-Scale Solar228 MW · 44 units · 7%
Bioenergy174 MW · 8 units · 5%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Manchester tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 18,500+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="equinix-ma3-manchester-joule-house-a973770c" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=equinix-ma3-manchester-joule-house-a973770c
Schema, units and the population behind every count: https://dchub.cloud/bind