Equinix VA1 — Burnaby Data Center

Equinix VA1 - Vancouver is a data center operated by Equinix in Burnaby, BC, CA. The facility is currently operational. It sits in the Vancouver data-center market on the BCH grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 14.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Burnaby
State
BC
Country
CA

Market intelligence

AVOID

Data Center Power Index verdict for Vancouver — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Vancouver — the market this facility sits in (full deep-dive →).

Vancouver's data center footprint remains modest at 35 MW across 86 tracked facilities, with Cologix commanding the largest operational presence at 12 MW, followed by its affiliated entity Cologix, Inc. at 5 MW. The market is heavily operator-concentrated, with the top five players controlling the majority of deployed capacity and no meaningful geographic diversification of infrastructure. This limited scale reflects a market still in early-stage consolidation, lacking the density and redundancy profiles that characterize mature North American hubs. The DCPI verdict of AVOID—driven by an excess-power score of 44/100 paired with constraint at 33/100—signals structural headwinds for acquisition-stage investors. The moderate excess-power rating indicates available capacity exists but is not competitive or consistently accessible; the low constraint score reflects weak pricing power and…

Location

Area Burnaby, BC, CA

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketVancouver
Grid operatorBCH
Data Center Power IndexAVOID
Est. time to power14.4 months
LocationBurnaby, CA
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Equinix VA1 - Vancouver in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Arista SD-WANSMARTNET TELECOM

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 11 operating generating units totalling 915 MW within about 50 km of Burnaby, CA. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas456 MW · 3 units · 50%
Hydropower288 MW · 4 units · 31%
Bioenergy171 MW · 4 units · 19%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Burnaby tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="equinix-equinix-va1-vancouver-3b76eaba" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind