EMERSON GLOBAL DATA CENTER is a data center in MARSHALLTOWN, IA. The facility is currently active. It sits in the Cedar Falls data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 16.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Cedar Falls — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Cedar Falls — the market this facility sits in (full deep-dive →).
Cedar Falls hosts three tracked data center facilities totaling 0 MW across three operators: Cologix, Cologix, Inc., and Connect Des Moines, LLC. The market's Data Center Power Index reveals a critical constraint: excess-power scores 43/100 while constraint metrics reach 36/100, signaling acute infrastructure limitations. With zero megawatts currently tracked and a fractured operator base showing no dominant player, Cedar Falls operates as a micro-market with minimal scale and visibility among institutional investors. The DCPI verdict of AVOID is unambiguous for acquisition-focused capital. An excess-power score of 43/100 means available grid capacity is marginal and insufficient to reliably support hyperscale or major enterprise deployments. The constraint score of 36/100 further indicates that utility interconnection timelines, transmission bottlenecks, or local load limitations will…
Published DC Hub data for this location.
Comparable facilities in MARSHALLTOWN tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="emerson-global-data-center-2a8b7fd8" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=emerson-global-data-center-2a8b7fd8