EdgeConneX Phoenix (EDCPHX01)

EdgeConneX

EdgeConneX Phoenix (EDCPHX01) is a data center operated by EdgeConneX in Tempe, AZ, US. The facility is currently operational. It sits in the Tempe data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 11.0-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.

Status
Operational
City
Tempe
State
AZ
Country
US
Coordinates
33.3955, -111.9701
Address
3011 S. 52nd St

Market intelligence

BUILD

Data Center Power Index verdict for Tempe — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Tempe — the market this facility sits in (full deep-dive →).

Tempe's data center footprint remains nascent, with 11 tracked facilities totaling 0 MW of operational capacity. The market is fragmented across multiple operators, with EdgeConneX holding the largest presence at two facilities, followed by single-site operators including Alembic Computer Services, Inc. and Omnis Network. Three additional operators remain unidentified in current tracking, suggesting either emerging local players or facilities in early development stages with incomplete operator registration. The DCPI verdict of BUILD is anchored in exceptional excess-power availability 69/100 paired with relatively low infrastructure constraint 37/100, indicating Tempe possesses the foundational conditions for new data center development without immediate grid bottlenecks. This combination creates a window for greenfield investment before competitor saturation consumes available power…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketTempe
Grid operatorWECC
DC Hub Power IndexBUILD
Est. time to power11.0 months
LocationTempe, US

Power generation nearby

DC Hub tracks 57 operating generating units totalling 4,978 MW within about 50 km of Tempe, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas4,731 MW · 34 units · 95%
Utility-Scale Solar130 MW · 20 units · 3%
Hydropower117 MW · 3 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Tempe tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="edgeconnex-edgeconnex-phoenix-edcphx01-c349c72a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=edgeconnex-edgeconnex-phoenix-edcphx01-c349c72a
Schema, units and the population behind every count: https://dchub.cloud/bind